The Build
What happens next?
Diary
Date | Stage |
27/3/2011 | Found Donor Car |
21/4/2011 | Started dismantling donor car |
27/4/2011 | Ordered Kit |
19/5/2011 | Finished dismantling donor car |
21/5/2011 | Shell disposed of |
29/5/2011 | Started refurbishing back axle assembly |
16/6/2011 | Finished refurbishing back axle |
18/6/2011 | Kit arrived |
21/6/2011 | Back axle installed |
26/6/2011 | Chassis Painted |
27/6/2011 | Engine in and front suspension fitted |
01/07/2011 | Brake pedals, servo and master cylinder, pipes cut and put in place |
03/07/2011 | Radiator and steering column fitted |
07/07/2011 | Heater modified |
08/07/2011 | Wipers fitted |
13/07/2011 | Transmission tunnel modified and gearstick mounted, dashboard trial fitted, front fibre glass floor well trimmed almost to fit (still some work to do) |
14/07/2011 | Radiator shell installed, bonnet top panels fitted |
18/07/2011 | Power steering reservoir located and power steering plumbed in |
20/07/2011 | Petrol tank installed, rear seat belt mounting posts fitted |
21/07/2011 | Front seat belt posts fitted, heater fitted |
27/07/2011 | Brake pipes secured |
28/07/2011 | Front wings trial fitted, radiator shell refitted, picked up leather seats |
27/08/2011 | Petrol pump fitted and piping plumbed in and secured. Wiring Loom, received. |
28/08/2011 | Front bumper, brackets painted and bumper fitted. |
30/08/2011 | Rear wings and back panel temporarily fitted |
31/08/2011 | Running boards temp fitted |
05/09/2011 |
Radiator header tank and air filter fitted, bracket for ignition coil fabricated |
10/09/2011 | Rear seat back brackets fabricated and installed so they fold down to give access to the limited boot space |
12/09/2011 | Exhaust fitted except for the back box |
15/09/2011 | Headlamp shell fitted |
20/09/2011 | Front panel cut to size and temp fitted, bottom hose fitted |
21/092011 | Windscreen pillars filled, front floor fibre-glassed to fit around the auto gear shift |
23/09/2011 | Windscreen pillars sanded and refilled |
11/10/2011 | Brackets fabricated and front seats trial fitted |
12/10/2011 | Sierra seat belt bracket modified and fitted to the Ka seat |
14/10/2011 |
Tail lights fitted temporarily |
19/10/2011 |
Additional securing clips on fuel pipe |
20/10/2011 |
Plywood floor and front fibre-glass floor fitted |
21/10/2011 |
Front seats fitted, windscreen surround refilled |
24/10/2011 |
Collected front shocks, windscreens, bonnet sides and fuel sender unit from Beauford |
27/10/2011 | Fitted fuel sender unit |
28/10/2011 | Fitted front shocks |
31/10/2011 | Door pillars/hinge covers measured to fit |
02/11/2011 | Bolts fibre-glassed in to door pillars, doors trimmed to fit |
03/11/2011 | Door pillars fitted. Badge bar fabricated and fitted |
04/11/2011 | Body prep - lots of sanding |
07/11/2011 | Front indicators fitted + more body prep |
09/11/2011 | Dashboard cut out and fitted instrument cluster |
10/11/2011 | O/S bonnet side fitted |
13/11/2011 | Planned a centre console |
14/11/2011 | Mocked up centre console |
15/11/2011 | Fitted N/S bonnet side, removed the front wing and running board to prep for painting |
17/11/2011 | More sanding and filling |
18/11/2011 | More filling and sanding |
12/12/2011 | Started painting |
13/12/2011 | Painting |
14/12/2011 | Painting |
15/12/2011 | Painting |
16/12/2011 | Painting |
Christmas Break | |
15/01/2012 | Sanding |
16/01/2012 | Worked on window winders |
17/01/2012 | Collected Hood |
18/01/2012 | Started making luggage rack |
19/01/2012 | Started work on exhaust |
23/01/2012 | Fitted rear bumpers |
25/01/2012 | Lengthened window winder arms |
30/01/2012 | Fitted window winders |
31/01/2012 | Wing piping |
01/02/2012 | Refit wings and running board, cut out interior and door cards, rear fog & reversing lights |
02/02/2012 |
Refit front lights and badge bar. Label all connections on wiring loom. |
03/02/2012 | Made fibre-glass glove box |
07/02/2012 | Joined glove box to dash and varnished panel |
08/02/2012 | Started to take apart Sierra loom |
09/02/2012 | Continued to take apart Sierra loom |
10/02/2012 | Isolated the rest of engine loom |
11/02/2012 | Worked on wiring |
13/02/2012 | Worked on wiring |
14/02/2012 | Worked on wiring |
16/02/2012 | Fitted petrol filler pipe, got the engine to turnover |
17/02/2012 | Tried to fit seatbelts, bled brakes |
18/02/12 - 06/03/12 |
Wiring installed temporarily (twisted wires) |
07/02/12 | Rear floor panel installed, fuel filler pipe connected |
08/03/12 | Filler pipe reconnected! Started car (Hooray!) |
13/03/12 | Connected rear lights |
14/03/12 | Connected eyes up (headlights) |
15/03/12 | Started tidying wiring up, making connections permanent |
16/03/12 | Finished making connections permanent |
17/03/12 | Made under tray for passenger side dash |
18/03/12 | Covered under tray in foam and vinyl |
20/03/12 | Made under tray for drivers side |
21/03/12 | Covered under tray in foam and vinyl |
22/03/12 | Made ducts and vents for demister |
23/03/12 | Covered Dash assembly in foam |
24/03/12 | Covered Dash assembly in vinyl |
25/03/12 | Installed dash assembly and dash board |
28/03/12 | Cut out holes for switches and radio in centre console panel |
29/03/12 | Assembled centre console trimmed to fit in car |
30/03/12 | Covered centre console in foam |
31/03/12 | Covered centre console in vinyl and trial fitted in car |
03/04/12 | Installed radio |
07/04/12 | Installed centre console and connected the switches |
09/04/12 | Covered trim panels in footwell and installed speakers |
10/04/12 | Partially fitted hood and glass in rear door |
11/04/12 | Fitted door cards, made lever for heater |
12/04/12 | Re-covered undertray |
14/04/12 | Fitted split windscreen |
16/04/12 | Worked on interior trim |
17/04/12 | Worked on interior trim |
18/04/12 | Worked on interior trim |
19/04/12 | Worked on interior trim |
24/04/12 | Fitted windscreen washers and interior mirror |
30/04/12 | Fitted new Securon seatbelts in rear |
01/05/12 | Fitted beading around windscreen |
09/05/12 | Reworked Luggage rack and bumper |
12/05/12 | Reworked badge bar at front |
22/05/12 | Made surround for rear bumper support |
23/05/12 | Anchored electronic ignition, battery securing plates, tidied up engine bay. |
24/05/12 | Cut and shaped aluminium aluminium trim for luggage rack. |
25/05/12 | Fitted door mirrors |
30/05/12 | Tried to trace the electrical fault |
31/05/12 | Fitted side screens |
01/06/12 | Fitted stop for the hood rails |
08/06/12 | Door locks arrived |
09/06/12 | Door locks and exterior handles temporarily fitted |
10/06/12 | Striker pins fitted |
12/06/12 | Door locks adjusted and secured |
13/06/12 | Covered door cards with cream leatherette |
15/06/12 | Fixed door cards and covered seatbelt posts in foam and leatherette |
18/06/12 | HAPPY BIRTHDAY TWIGGY - 1 year since kit was delivered |
18/06/12 | Cut handle spindles to size and drilled for securing screws. Fitted interior handles |
20/06/12 | Fixed rear speakers below rear seat |
21/06/12 | Tidied up engine bay a bit more (cables etc), tightened up wing and running board bolts. |
22/06/12 | Fitted dzus fasteners to bonnet sides |
27/06/12 | Took out dashboard to find wiring fault |
28/06/12 | Put back dashboard! |
03/07/12 | Window rubbers and cleaned car |
09/07/12 | Seals to try and make weatherproof |
10/07/12 | Carpet and interior tidying up |
13/07/12 | Touched up all the chips in the paintwork from, put cap nuts on exposed bolts |
18/07/12 | IVA test has come through for 20th Sept |
21/07/12 | Changed rear seatbelts, installed foam rubber strip on bonnet panels |
30/07/12 | Cut template out for wing valances |
01/08/12 | Cut out valances and fitted to wings |
07/08/12 | Painted valances and made bracing bars |
05/09/12 - 07/09/12 | Worked on the hood trim and seals to make it a little more watertight |
13/09/12 | Fitted headlamp rims and door stays |
14/09/12 | Fitted sides to rear compartment to protect seatbelts wiring and petrol pipe |
20/09/12 | Took the car for its IVA test - Failed |
21/09/12 | Started remedial work |
22/09/12 | Replaced handles |
24/09/12 | Hinges, body projections |
25/09/12 | Rear seatbelt bracing |
26/09/12 | Rear seatbelt bracing |
27/09/12 | Replaced fuel filler |
28/09/12 | Booked the re-test - 8th November was the earliest available slot |
08/11/12 | IVA re-test PASSED |
12/11/12 | Took the forms in to the DVLA |
15/11/12 | Appointment for inspection came through |
22/11/12 | Car inspected |
24/11/12 | Licence number and tax disk arrived, had number plates made up, on the road |
11/12/12 | Started on building the trunk |
19/12/12 |
Trunk built and fitted to the car |
20/02/13 | Won an auction on Ebay for 4 alloy wheels |
14/03/13 | Trunk picnic table, wine glass holder and champagne bottle holder completed |
16/05/13 |
Fitted spare wheels on the front wings |
18/05/13 | Made drinks tray/bottle and glass holder for inside the car |